October 2, 2012: PROMOD Simulation for 2012 Study Year – Southeast Wisconsin Congestion Summary

Table 1 summarizes the Southeast Wisconsin congestion based on a PROMOD simulation for 2012 study year “before” and “after” Pleasant Prairie – Zion EC 345 kV project. 

The table includes the following information:

  • List of constraints “before” and “after” Pleasant Prairie – Zion EC 345 kV project
  • Annual congestion hours associated with the constraints (Simulation Data)
  • Annual shadow price associated with the constraints (Simulation Data)
  • Congestion severity index associated with the constraints (Simulation Data)

Please contact Dale Burmester, Manager – Economic Planning, at dburmester@atcllc.com or by phone at (608) 877-7109 if you have any questions.