PROJECTS (updated Sept 2008)
    Classifications
Completed since 2007
New in 2008
Under construction
Approved
Pending approval
Costs
Generation Interconnections
T-D Interconnections
  RELATED RESOURCES
 
Table PR-1 -- Projects Completed since 2007 Assessment (104k pdf)
COMPLETED SINCE 2007 PDF of Current Page
 

Transmission projects significantly affecting system performance that have been completed since the 2007 Assessment was issued in November 2007 are listed in Table PR-1.

 

Most notable include:

  • Constructed the Stone Lake-Arrowhead 345-kV line
  • Expansion of the Arrowhead Substation
  • Constructed a new permanent Stone Lake Substation
  • Constructed a Rubicon-Hustisford 138-kV line
  • Rebuilt/converted the Hustisford-Horicon 69-kV line to 138 kV
  • Constructed 138/69-kV substation at Hubbard
  • Constructed a new Cranberry-Conover 115-kV line
  • Reconductored the Saukville-St. Lawrence 138-kV line

 


 
Copyright 2008 American Transmission Company. All Rights Reserved