PROJECTS (updated Sept 2008)
    Classifications
Completed since 2007
New in 2008
Under construction
Approved
Pending approval
Costs
Generation Interconnections
T-D Interconnections
  RELATED RESOURCES
 
Tables PR-2 through PR-27 -- 2008 TYA Project Detail Tables
Figure PR-6 -- Number of Projects by Status
Table PR-1 - Projects Completed since 2007 Assessment
 
CLASSIFICATIONS PDF of Current Page
 

 In our 10-Year Assessments and Updates, projects are identified that address reliability issues, economic benefits, loss savings, transmission service issues, generation interconnections or some distribution interconnections, or any combination of the above. In general, these projects address system performance issues identified using the governing system planning criteria or economic benefits for customers. We have numerous other projects under way or under evaluation that address other issues such as obsolete substation equipment, poor line facility condition, line relocations and most distribution interconnections. The projects referenced in the project tables PR-2 through PR-27 generally include only those projects that at least in part address system performance issues.

 

To facilitate an understanding of the status of the various future projects, we classify projects into one of three possible categories – Planned, Proposed or Provisional. Each classification has specific criteria based on the status of the project as outlined below:

 

Planned projects:

  • ATC planning is complete;
  • if required, we have applied for regulatory approvals, which may be pending or have been issued; and
  • project may be under construction or in construction planning phase.

 

Proposed projects:

  • ATC planning is not complete;
  • ATC has not yet pursued regulatory approvals; and
  • project represents ATC’s preliminary preferred project alternatives from a system performance perspective.

 

Provisional projects:

  • ATC planning is not complete;
  • ATC has not yet sought regulatory approvals; and
  • project does not necessarily represent ATC’s preliminary preferred project alternative, but does reflect meeting the need identified.

 

In the 2001-2008 10-Year Assessments and Updates, we identified or assumed responsibility for 648 projects that address system performance issues. Figure PR-6 illustrates the status of all projects ATC has considered from 2001-2008. Regarding Figure PR-6, it is worthwhile to note that:

  • ATC has completed 266 projects and another 25 are under construction. Notable projects most recently completed are listed in Table PR-1. Projects under construction include capacitor bank installations, Oak Creek generation-related upgrades, and the Gardner Park-Highway 22 and Paddock-Rockdale transmission line projects.
  • 84 projects have been replaced with alternate project solutions. It is not unusual that the status of certain projects will change or evolve since customer needs and uses of the transmission system continually are changing.
  • ATC canceled 137 projects that were identified in previous Assessment reports due to changing needs and up-to-date information. Most of these projects were relatively minor projects, involving only replacement of equipment at existing substations.
  • 159 future projects are in various stages of evaluation or development (Planned (which includes Regulatory and Under Construction), Proposed or Provisional).

 

 

 
Copyright 2008 American Transmission Company. All Rights Reserved